Resetting the material library sync is one of the first steps in triaging an issue with the sync or assets/batches from SNB not appearing inside Inventa.
1. From SNConfig > Materials > Select library (For example: Compounds) > Data Factory Mapping > Project Activation & Status.
2. Turn off the toggle for the project you are working on .
3. Confirm Sync Disable in the pop-up window
4. Turn on the toggle for the same project .
5. Confirm Sync Enable in the pop-up window
An orange "Syncing" label will appear next to the project until all materials are synchronized, then it will change to a green "In Sync" label.
Comments
0 comments
Please sign in to leave a comment.